top of page

PAST WORK

Driving Improvement

Each project undertaken was always started with the end result in mind.

PRODUCT EVALUATION PROGRAM DEVELOPMENT AND IMPLEMENTATION

March 2021

Designed evaluation program for for Long Term Retardant products

FIRE AIRBASE DEVELOPMENT AND COST OPTIMIZATION

November 2019

Development and improvement of aerial fire fighting bases across Victoria Australia

LOGISTICS STORAGE AND OPTIMIZATION OF LONG TERM RETARDANT 

April 2020

Consolidation of all retardant to a single site for ease of management, cost savings/avoidance and better operational integrity

RECONFIGURATION OF LOGISTICS AND ENGINEERING SERVICE CENTER

June 2018

Consolidation of engineering departments and logistics department in both physical infrastructure and process refinement across three geographical areas.

The above is just a sample of the projects however all of them have change management, stakeholder engagement, operational requirements and cost restrictions on all occasions.

Building Blocks
Return to Home Page: Projects
bottom of page