top of page
PAST WORK
Driving Improvement
Each project undertaken was always started with the end result in mind.
PRODUCT EVALUATION PROGRAM DEVELOPMENT AND IMPLEMENTATION
March 2021
Designed evaluation program for for Long Term Retardant products
FIRE AIRBASE DEVELOPMENT AND COST OPTIMIZATION
November 2019
Development and improvement of aerial fire fighting bases across Victoria Australia
LOGISTICS STORAGE AND OPTIMIZATION OF LONG TERM RETARDANT
April 2020
Consolidation of all retardant to a single site for ease of management, cost savings/avoidance and better operational integrity
RECONFIGURATION OF LOGISTICS AND ENGINEERING SERVICE CENTER
June 2018
Consolidation of engineering departments and logistics department in both physical infrastructure and process refinement across three geographical areas.
The above is just a sample of the projects however all of them have change management, stakeholder engagement, operational requirements and cost restrictions on all occasions.
Return to Home Page: Projects
bottom of page